Now that the waka panels are in place manouvering between them can be quite a challenge for the scissor hoist operators.
The Southern wall showing the murals with the future doors into the current library. The predominant colours so far include beautiful shades of teal.
Piles of tiles waiting for the tiler to be work within the next couple of weeks on the flooring stage of the project.
No comments:
Post a Comment