A peek inside this morning let us see what all of the noise is about.  There are concrete footings where freezers and other equipment used to stand that have to be removed to give us a level floor.  There are channels to be dug in the existing concrete.  So men driving the heavy machinery are making rapid progress.   Some of the steel beams that support the existing mezzanine floor are being removed to create void above the back corner which will let in lots of natural daylight.  It's all very busy and we are grateful to the site foreman, Mario Hori te Pa, for making it possible for us to keep this log.



The big jack hammer in action.














North end of the interior - the truck parked inside  makes it really obvious how much room there is inside building.