Wednesday, June 20, 2012

Every day it's getting closer!

Just like it says in the Buddy Holly classic - "goin' faster than a roller coaster"





The plasterers are putting finishing touches on the beams and in the offices.  The small office walls are painted and they look great.  Lovely to have such a splash of bright colour - it looks as if the sun is out in the corner. 










With the tiles on the central area floor and the timber on the panels having a coat of sealant it's all coming together nicely.  The new entrance doors a the Mall corner entrance have been fitted.  It will be wonderful to be able to have doors open during a southerly and not have a freezing wind blow straight inside with every customer who walks in! 








The sparkies are busy putting up elegant light fittings.  Light shades are still all covered in protective plastic so as the keep the dust free as the building work carries on.









The guys outside are preparing the front entrance for concreting.  Footings for the outside edges of the waka shapes are in.






Inside the building the waka floors will be polished timber.  Outside the waka floors will be timber decking - should be a lovely spot to sit for lunch in summer, and there will be a garden across the car park edge parallel with the front of the building.









The surrounds for the Chinese garden are going up and now it's easy to see how big it will be.  (My colleague said she hoped she wouldn't have to do the weeding!)

No comments:

Post a Comment